DiGeronimo
design for a 50 man Forward Mobility Unit enables construction
workers to spend 5 to 10 days local to the construction
site, eliminating the dally commute to base camp. DiGeronimo
designs for modularity include barracks, covered storage,
vehicle maintenance, classrooms, and offices.
A 8,500
man camp can be erected in 19 days. The units ship flat,
so the line of transport is short. The 50 man Forward Mobility
Unit travels in just three (3) trailers. Each panel is structural
including a structural floor, and therefore the building
may be erected up to two stories high. Within each panel
are the factory installed electricity, windows, and doors
for highest quality control. The units are warranted and
guaranteed with a life span of 20 years.
The DiGeronimo solution is total turnkey - complete with
transport, panels, erection, furniture, HVAC, and communications
equipment. Our maintenance package can include dally water
food and laundry service. Our maintenance package can include
complete replacement within set time limits.